Location & schedule
Your site, deadlines and working constraints.


CHW 115 closed head, five jaws for five diameters and oxygen monitoring. For pharmaceutical and food industries.
Explore the complete kit01
Indicative starting composition: models, quantities, compatibility and availability are confirmed in the quote.
02
Rental equipment for your own crew.
| Reference | Included equipment | Qty |
|---|---|---|
| LOC67917 | Pressure regulator with 2 flowmeters DM-AR/MIX T, 200 bar, 2 × 20 l, G 1/4″ | 1 |
| LOC67005 | Gas hose 2 m, 1/4″ connectors at both ends | 1 |
| LOC67006 | Purge hose 8 m with valve, 1/4″ connector, hose diameter 6 mm | 1 |
| LOC68025 | Oxy HP 2.0 oxygen analyser with documentation | 1 |
| LOC68235 | Orbital S7 Compact MV 200 A power source | 1 |
| LOC67441 | CHW 115 G closed head — tube outside diameter 9.53–114.3 mm | 1 |
| LOC67643 | CHW G handle and cable assembly, 8 m | 1 |
| LOC67597 | Clamping jaw for CHW 115 G/W | 5 |
| LOC67933 | Trolly Orbital L transport trolley, assembled | 1 |
| LOC67988 | CHW welding head holder | 1 |
| LOC68154 | S7 controller holder | 1 |
Rental is charged per calendar day, from the dispatch date until the equipment is received back at our premises.
A one-off preparation and maintenance fee is added to the daily rate. Delivery and training are charged according to the time and services required. Training is free when equipment is collected from our premises.
If the equipment is purchased within 5 weeks of the end of the rental, rental charges only, up to a maximum of 30 calendar days, are deducted from the purchase price.
Payment is due within 10 days net from handover of the equipment.
03
Your site, deadlines and working constraints.
Describe what you want to install, join or modify. Drawings or photos, if available, help us prepare the kit.
Your procedures, standards and specific constraints.

Our approach
Rental equipment for your own crew.
ExpertiseYour project
A question or a specific requirement? Our team is here to discuss your project.
Contact us